The Select Board convened for its regular meeting, addressing a range of town matters including changes to adult recreation programming, an update on the proposed Veterans Memorial, and ongoing infrastructure projects. The Board also discussed the town’s financial status and reviewed the Hazard Mitigation Plan.

Adult Recreation Programming Changes Discussed

A resident voiced concerns on behalf of several citizens regarding the decision to discontinue adult active programming through the Recreation Department. The resident highlighted the value of activities such as guided hiking and bicycling, and praised the former staff member who led these programs. The resident suggested that the Recreation Department should cater to all age groups and encouraged the Board to reconsider funding for such a position, even mentioning the possibility of a petitioned warrant article. (link)

The Board clarified that the changes were part of a broader restructuring effort, not a targeted elimination of adult programming. A board member noted that the decision was influenced by the need to cut $514,000 from the proposed budget earlier in the year. Town staff explained that the restructuring aimed to evaluate all town positions, similar to changes already underway in the wastewater and Public Works departments. While the former staff member’s position covered parks broadly — not solely adult programming — town staff expressed hope that adult programming would continue and that the former staff member might remain with the town in another capacity. Another board member added that the programs served a limited number of community members, and revenues did not cover the associated salary and benefits. The Board requested time to work through the restructuring process, assuring attendees that eliminating adult programming was not their intent.

Veterans Memorial Committee Presents Update

A committee provided an update on the proposed Veterans Memorial, outlining its mission, potential locations, and design concepts. The committee recommended the intersection of Packard’s Road and Valley Road as the preferred site, citing its visibility to both residents and visitors. The proposed design includes a stone monument and flagpoles, with an AI-generated depiction shared with the Board. (link)

The committee requested $5,000 in seed money to establish a revolving account, with the expectation that the majority of funding would come from private donations. Board members expressed strong support for the memorial, with one suggesting an increase in the seed money to $10,000 or $20,000 given the project’s importance. The idea of dedicating the memorial as part of Waterville Valley’s bicentennial celebration in 2029 was also raised. The committee plans to consult with a monument company to determine costs and will seek a landscape designer for walkways and plantings. The Board acknowledged the need to approve the location in order to move forward with fundraising and design.

Select Board Minutes Tabled

The approval of the Select Board minutes was tabled, as the draft minutes were not included in the meeting packet for review. (link)

Town Manager Update

Town staff reported that interviews for the Superintendent of Public Works position have concluded and a letter of offer is being prepared. Further updates will be provided once the offer is presented. (link)

Wastewater Treatment Plant Project Progresses

Updates were provided on the Wastewater Treatment Plant project, including the “Pipeline to Plymouth” regionalization study. Town staff noted ongoing correspondence with Congresswoman Maggie Goodlander’s office for support and contact with the Town of Campton’s town administrator, who expressed interest in learning more. A feasibility study meeting was scheduled for the following Monday with interested parties — including Plymouth and NH DES — to assign responsibilities for reaching out to other entities such as the state Department of Transportation, EPA, and the U.S. Forest Service. (link)

Regarding the current path, the project remains on schedule and in compliance with its Administrative Order on Consent (AOC). Weekly design meetings are held with Black & Veatch, with the 60% design milestone due in mid-December. The Board was reminded that securing funding is a slow process, and that Black & Veatch’s governmental arm has been actively seeking grant opportunities for well over a year.

Municipal Solid Waste Compactor Nears Delivery

Town staff reported that the new municipal solid waste compactor is expected for delivery in mid-November, with electrical work already underway. It is anticipated to be operational within a day or two of delivery, with full use commencing December 1st. Some local businesses — including the resort and condominiums — have already transitioned to private haulers. The town’s current hauling contract with Casella at the Bethlehem transfer facility will end in December when that facility closes. (link)

Snow’s Mountain Road Project: Sewer Reconsideration Implications

A representative from HEB Engineers provided an update on the Snow’s Mountain Road project. The roadway, water, and drainage designs are substantially complete, with one permit pending from NH DES. The engineer explained that the project was redesigned after the town voted against including a sewer component, at which point the water line was moved back to its original trench location to simplify construction and reduce costs. (link)

Reintroducing sewer at this stage would require a complete redesign of all utilities, full re-permitting, and re-bidding the project — likely delaying construction until 2028 and incurring significant additional costs. It would also require excavating portions of Boulder Path Road, which has already been reconstructed. The engineer recommended a decision be made as soon as possible, as the contractor has reserved 2027 for the current project scope.

Board members discussed the implications at length, including potential lawsuits from homeowners, the absence of a concrete plan for septic system replacement, and the impact on future development in the area if sewer is not installed. Concerns were also raised about the cost and complexity of individual septic replacements, which could vary significantly from property to property. Town staff emphasized the critical importance of addressing the water main issues on Snow’s Mountain Road for safe water delivery. The Board decided to postpone a final decision on the sewer question until its next meeting to allow for further deliberation.

Off-Site Solicitation and Food Trucks

A discussion was held regarding off-site solicitation — specifically food trucks — in light of recent Planning Board discussions about a zoning amendment request from Waterville Valley Resort to allow food service in the special district overlay created for the BBTS area. A board member clarified that Select Board Ordinance #9 governs off-site solicitations and specifies when a permit is required. Under the ordinance, a permit is not required if the food truck owner owns or leases the land and food service is an allowed accessory use on that land. (link)

The Board expressed concern that Planning Board discussions may not be fully accounting for this existing ordinance. Historically, the Board has sought to limit food trucks in order to unfortunately avoid competition with established town businesses. The possibility of using conditional use permits was discussed as a mechanism to impose necessary restrictions — such as noise limits and waste management requirements — to ensure any food truck operation benefits the broader community.

Financial Report and Tax Rate Discussion

The Board reviewed the town’s financial report, including the MS-535 and MS-434 forms. Town staff noted that the MS-535 needed to be signed and uploaded to the Department of Revenue Administration (DRA) portal, which would prompt the DRA to initiate a discussion about the 2026 tax rate. The report indicated a $430,000 surplus for 2025, primarily attributable to unfilled positions including the former Town Manager, wastewater department roles, and a Public Works position. (link)

The Board discussed options for applying the surplus, such as reducing the 2026 tax rate or offsetting future warrant articles — potentially including contributions toward the wastewater treatment project. The town’s undesignated fund balance currently stands at a healthy 13.6% of the operating budget; adding the projected 2026 surplus of approximately $300,000 would bring it close to the DRA’s upper threshold of 17%. The Board decided to wait for the DRA’s proposed tax rate before making a final decision on how to use the surplus, though the 2026 tax rate is expected to remain relatively flat compared to 2025.

Fall Foliage Foot Race Donation Approved

The Board approved a motion to donate $830, collected from the Fall Foliage Foot Race, to the Rey Center. (link)

Hazard Mitigation Plan Adopted

Committee members presented the updated Hazard Mitigation Plan. A key point of discussion was the plan’s assessment of wildfire risk, which was rated as “very low” probability and “low” risk. A board member expressed disagreement, citing increased drought conditions and recent regional fires, and suggested the risk rating should be elevated to “medium.” (link)

The Fire Chief explained that local fires are typically slow-moving ground fires rather than the fast-spreading crown fires seen in western states, and noted that the town’s core sits in a bowl, meaning fires starting in the surrounding forest are more likely to burn uphill away from developed areas. He also detailed upgrades to the fire department’s wildfire response capabilities and described ongoing coordination with the White Mountain National Forest. Committee members clarified that changing the risk rating at this late stage of the approval process would require the plan to return to FEMA, potentially jeopardizing grant funding tied to the plan’s completion. They noted that the annual review process allows for adjustments, and that the next full plan update — due in five years — could incorporate updated risk assessments. The Board also briefly discussed historical zoning setbacks near forest land and the potential for future zoning amendments to create buffer zones.

Despite lingering concerns about the wildfire risk assessment, the Board voted to approve the Certificate of Adoption for the Hazard Mitigation Plan Update 2026, acknowledging its importance for maintaining FEMA grant eligibility.

Calendar Review and Other Business

The Board reviewed upcoming calendar items. The next Budget Advisory Committee meeting is scheduled for November 8th, where the WVAIA and Rey Center will present funding requests. The Board thanked the Town Moderator, Town Clerk, Deputy Town Clerk, and volunteers for a smoothly run general election. The next Planning Board meeting is scheduled for November 12th, and the next Select Board meeting for November 18th.

Under Board concerns and directives, topics included the need to address cemetery expansion, confirm the fireworks contract for next year and its pricing, and clarify responsibility for maintenance and potential removal of stairs leading to a pond. The Municipal Solid Waste Committee will reduce its meeting frequency to once a month beginning in December, with ongoing discussions about its longer-term role.

The Board then moved into a non-public session for negotiations.